Data Center Relocation Services & Technical Support by Abtech Support
Let Abtech make your relocation a non-event
Moving your data center to another building, town, state, or country is more than just backing up a van and loading the boxes. This task is enormous and takes time away from your everyday responsibilities of strategic data management.
The professionals at Abtech Support can manage every detail of your data center relocation. We help you avoid the nightmares associated with the physical move. With services ranging from simply moving unracked servers across the street to de-installation and reinstallation of enterprise architecture across North America, our engineers and logistics team understand the time-sensitive value of your business' data assets.
Abtech Support’s relocation services include:
Planning
- Assignment of a project manager
- Dates & timeframes established
- Manpower & activity coordination
- Collection of data
- Data Center Consolidation
- Existing and New data centers
Site Evaluation
- Power requirements
- AC and ventilation requirements
- Network requirements
- Equipment positioning requirements
De-installation
- CE Onsite
- Equipment & cables labeled
- All equipment documented
- Equipment secured for transport
Transportation
- Bonded Professional Movers
- Supervision of loading and unloading
- Multiple Transit options
- Special packaging available
Re-Installation
- CE Onsite
- Equipment positioning and installation
- Operation verification
- System Diagnostics
- Error Diagnosis (if needed)
- Connect system to network
- Onsite replacement hard disk drives availability
Repair & Insurance
- Highest priority repair status
- Full system replacement
- Full maintenance contracts
MAKING A CASE FOR ABTECH:
Telecommunications Company Data Center Move
Challenge: A major telecommunications service provider on a large Caribbean island was experiencing noticeable declines in performance on their production systems. With approximately 160,000 telephone customers, there was an imminent danger of dropping phone calls if the systems were to overload. The Telco needed to upgrade their hardware systems immediately because of an upcoming holiday weekend. They required a minimal effect on daily operations and minimal risk of failure during the upgrade.
Solution: Abtech was notified on a Monday and was able to provide the logistics of setting up a test environment by Wednesday at one of Abtech’s nationwide service depots. Once these new systems were tested by Abtech and The Telco engineers, Abtech personnel properly packaged the equipment for safe transport back to the customer’s island facility.
With Abtech’s assistance, the customer was able to upgrade their hardware systems in a very short time frame and with minimal downtime. The Telco will be able accommodate growth for years to come.
In many ways your data center relocation is a managed disaster recovery event. That why Abtech takes every precaution to ensure your project receives the attention it requires to be successful and to be a non-event. For the most mission critical environments, ask about our “Zero Downtime Relocation.”